مشخصات پژوهش

صفحه نخست /Experience gained during ...
عنوان Experience gained during design and construction of the Jahgin RCC dam in Iran
نوع پژوهش مقاله ارائه شده کنفرانسی
کلیدواژه‌ها ندارد
چکیده Abstract: Construction of the first major RCC dam in Iran has been completed in January 2007. Jahgin dam with 78 meter height and 400,000 meter cube in concrete volume is located in a remote area at the South-east of the Country, in a region with very high temperatures and extremely difficult working conditions. It was attempted to adapt both the design and the construction method to the requirements of the RCC technology in order to exploit the great advantages offered by it. Although the original design was already a straight gravity RCC dam type, when performing the definitive construction design some improvements were introduced in order to achieve an “RCC- friendly” design. As a consequence the new design, together with the optimization of the construction processes, enabled the Contactor to place the RCC rapidly and efficiently, which led to a better execution quality, a schedule reduction and lower cost. This paper deals with the original and actual design criteria and construction of RCC works including development of mix design and full scale trails. RCC placement, compaction and quality control procedures and other relevant aspects are also discussed.
پژوهشگران محمد اسماعیل نیا عمران (نفر اول)