Title
|
Determining the periodicity and planned lead time in serial-production systems with dependent demand and uncertain lead time
|
|
Type
|
JournalPaper
|
|
Keywords
|
Serial production systems; Planned lead time; Periodic order quantity; Uncertainty ;Supply chain
|
|
Abstract
|
This paper considers a multi period serial production systems for one product and deals with the problem of planned lead-time calculation in a Material Requirement Planning (MRP) environment under probabilistic lead times. It is assumed that lead times for all stages have the same distribution with different parameters. A MRP approach with periodic order quantity (POQ) policy is used for the supply planning of components. The objective is to minimize the sum of fixed ordering, holding and backlogging costs. A mathematical model is suggested and then an optimal planning lead-time, ordering quantity and periodic time are determined.
|
|
Researchers
|
Heibatolah Sadeghi (First Researcher), Mehdi Heidari (Third Researcher), Ahmad Makouee (Second Researcher)
|