2024 : 5 : 4
Mohammad Rezaei

Mohammad Rezaei

Academic rank: Associate Professor
ORCID:
Education: PhD.
ScopusId: 6313
Faculty: Faculty of Engineering
Address:
Phone: 087-33660073

Research

Title
Development of a time-dependent energy model to calculate the mining-induced stress over gates and pillars
Type
JournalPaper
Keywords
Longwall mining, Strain energy, Time-dependent model, Destressed zone, Mining-induced stress
Year
2015
Journal Journal of Rock Mechanics and Geotechnical Engineering
DOI
Researchers Mohammad Rezaei ، Mohammad Farouq Hossaini ، Abbas Majdi

Abstract

Generally, longwall mining-induced stress results from the stress relaxation due to destressed zone that occurs above the mined panel. Knowledge of induced stress is very important for accurate design of adjacent gateroads and intervening pillars which helps to raise the safety and productivity of longwall mining operations. This study presents a novel time-dependent analytical model for determination of the longwall mining-induced stress and investigates the coefficient of stress concentration over adjacent gates and pillars. The model is developed based on the strain energy balance in longwall mining incorporated to a rheological constitutive model of caved materials with time-varying parameters. The study site is the Tabas coal mine of Iran. In the proposed model, height of destressed zone above the mined panel, total longwall mining-induced stress, abutment angle, induced vertical stress, and coefficient of stress concentration over neighboring gates and intervening pillars are calculated. To evaluate the effect of proposed model parameters on the coefficient of stress concentration due to longwall mining, sensitivity analysis is performed based on the field data and experimental constants. Also, the results of the proposed model are compared with those of existing models. The comparative results confirm a good agreement between the proposed model and the in situ measurements. According to the obtained results, it is concluded that the proposed model can be successfully used to calculate the longwall mining-induced stress. Therefore, the optimum design of gate supports and pillar dimensions would be attainable which helps to increase the mining efficiency.