2025/12/17
Isa Nakhai Kamalabadi

Isa Nakhai Kamalabadi

Academic rank: Professor
ORCID:
Education: PhD.
H-Index:
Faculty: Faculty of Engineering
ScholarId:
E-mail: nakhai.isa [at] gmail.com
ScopusId: View
Phone: 0988733666807
ResearchGate:

Research

Title
Scheduling with an outsourcing option on both manufacturer and subcontractorsand subcontractors
Type
JournalPaper
Keywords
Manufacturing; Outsourcing; Decomposition; Integer programming
Year
2013
Journal COMPUTERS & OPERATIONS RESEARCH
DOI
Researchers Hadi Mokhtari ، Isa Nakhai Kamalabadi

Abstract

This paper addresses a single-stage scheduling problem with outsourcing allowed where each job can be either scheduled for in-house production or outsourced to one of the outside subcontractors available. The manufacturer has an unrelated parallel machine system, and each subcontractor has its own single machine. Subcontractors are capable to process all the jobs. Unlike most of past research, our study considers the joint scheduling of both in-house and outsourced jobs simultaneously. The objective is to minimize sum of the total weighted completion time and total outsourcing cost. An integer programming formulation is presented and then improved through an optimality property on job orders. A heuristic algorithm is also introduced to decompose the problem into smaller and easier subproblems and solve them to optimality.